|
Dentellada has just finished the work in the port of CIVITAVECCHIA.
800 undersea drillings (with a diameter of 1200mm) were performed by Dentellada inthe basin of the Enel power plant in Torrevaldalliga - Civitavecchia (Italy).The diamond thread has been the tool used.

Noteworthy is the professionalism of personnel ashore and at sea, both for its high technical qualifications as for their safety and health atwork, since the storm made remarkably the underwater maneuvers.