|
Demolition of Ribadeo viaduct.
Work: Demolition of Ribadeo viaduct

Client: Dragados.

Location: Ribadeo (Lugo).

Term: 4 months.

Method of technical demolition applied: Brokk 90 robot with hammer.

Pictures: