|
Drilling of pipes inside of Lerez Tank
Work: Drilling of pipes inside of Lerez Tank

Client: Aquagest.

Location: Pontevedra.

Term: 3 days

Method of technical demolition applied: Diamond drilling (with a very long tool).

Pictures: