|
Demolition overpasses in Palanquinos
Work: Demolition overpasses in Palanquinos.

Client: UTE PALANQUINOS  (BRUESA-MARCO).

Location: Palanquinos-León.

Term: 2 weeks.

Method of technical demolition applied: Cut with wire-cutter-hammer                                          
                                                                 
The joint venture formed by Bruesa and Marco have become to trust in Dentellada to carry out the demolition of the overpass CV-195-12 located on the highway León-Burgos. The work began last December and it finished around December 23.
Specifically, the demolition of the overpass was made in two phases. Following the felling of the structure prior, proceeded to cut it in half and in each phase, the chunk was torn down for each direction of the highway. The method of demolition technique used has been cut with wire-cutter-hammer

.

Pictures: