|
Drilling in underground Madrid Tunnel
Work: Embajadores Tunnel.

Client: Dragados.

Location: Madrid.

Term: 8 Meses.

Method of technical demolition applied: Four demolition robots (brokk 330) with hammer and Top Tec 4500 machine with cutting heads.

Pictures: