Client: Pérez Abilleira construcciones.
Location: Pontevedra.
Term: 5 weeks.
Method of technical demolition applied: Sectioning with diamond disc and thread. Demolition with Brokk-90 equipment provided with shears. Crane of 130 tons and gondola.
Pictures: