|
Sectioning and withdrawal of the deposit in Ence, Pontevedra.
Work: Sawing and disposal of a tank in Ence' s Factory.

Client: Pérez Abilleira construcciones.

Location: Pontevedra.

Term: 5 weeks.

Method of technical demolition applied: Sectioning with diamond disc and thread. Demolition with Brokk-90 equipment provided with shears. Crane of 130 tons and gondola.

Pictures: