Client: Montajes NERVION.
Location: Meirama - La Caruaña.
Term: 10 weeks (double shift).
Method of technical demolition applied: Removal of fireclay briquet from the inside of conduits using Brokk 90 robots with hammer and inside a special structures. These "cages" are hung at 20 metres height becouse of the safety of the staff.
Pictures: