|
Enel Thermal Power Plant (Italy)
Work: Enel Thermal Power Plant (Italy).

Client: ACTISUB.

Location: Torrevaldalliga - Civitavecchia (Italia).

Term: 12 months.

Method of technical demolition applied: 8800 undersea drillings (with a diameter of 1200mm) were performed in the basin of the Enel power plant in Torrevaldalliga - Civitavecchia (Italy).The diamond thread has been the tool used.

Pictures: