|
TF-1 motorway (Santa Cruz de Tenerife)
Work: TF-1 motorway (Santa Cruz de Tenerife).

Client: Dragados.

Location: Santa Cruz de Tenerife.

Term: 22 months.

Method of technical demolition applied: The diamond thread and the flour sawing have been the tools used (working hours at night).

Pictures: