Work: TF-1 motorway (Santa Cruz de Tenerife).
Client: Dragados.
Location: Santa Cruz de Tenerife.
Term: 22 months.
Method of technical demolition applied: The diamond thread and the flour sawing have been the tools used (working hours at night).
Pictures: