Client: Arcelor Mittal iron and steel factory.
Location: Galati (Rumanía).
Term: 24 hours.
Method of technical demolition applied: Mainly, the work consisted of diamond drilling tasks in the blast furnace of the factory . A new method of drilling was developed because of the high temperatures (800 degrees centigrade and six meters deep) and the safety of the staff.
Pictures: