|
Arcelor Mittal Rumanía
Work: Arcelor Mittal Rumanía.

Client: Arcelor Mittal iron and steel factory.

Location: Galati (Rumanía).

Term: 24 hours.

Method of technical demolition applied: Mainly, the work consisted of diamond drilling tasks in the blast furnace of the factory . A new method of drilling was developed because of the high temperatures (800 degrees centigrade and six meters deep) and the safety of the staff.

Pictures: