Client: Arcelor Mittal iron and steel factory.
Location: Zenica (Bosnia - Herzegovina).
Term: 23 hours.
Method of technical demolition applied: Mainly, the work consisted of diamond drilling tasks in the blast furnace of the factory . A new method of drilling was developed because of the high temperatures and safety of the staff.
Pictures: